shelter site before construction

michael

wright

heublein

architect

desert shelter / taliesin west, arizona

150sf / designed 2002 / completed 2004

construction images: the site for the desert shelter was chosen in part because it had already been disturbed by the construction of a previous shelter. this shelter had been abandoned years before, leaving behind a concrete slab and several concrete block walls. the slab was incorporated into the new shelter, while the blocks were broken up and reused as aggregate for the poured concrete walls and bond beam.